Basic Info.
Type
Tube Shoulder Injection
Plastic Type
Thermoplastic
Plasticizing Way
Plunger Type
Computerized
Computerized
Speed
85~120 Pieces Per Minute
Tube Diameter(mm)
16~60 mm
Extrusion Spraying Mode
Servo Motor Control
Change Time of Head Tooling
18~23 Minutes
Change Time for The Orifice Pin
20~25 Minutes
Change Time of PE Color
30~35 Minutes
Specification
3470*2900*2490mm
Production Capacity
100set/Year
Packaging & Delivery
Package Size
347.00cm * 290.00cm * 249.00cm
Package Gross Weight
4500.000kg
Product Description
Extruded Tube Line (project solution)
| line #1: extruder (1/2/5/6 layer) - sorter - header (60/70/120) - sorter - printer (3/5/6/8 color)- sorter - capper(50/100) |
| line #2: extruder (1/2/5/6 layer) - sorter - printer (3/5/6/8 color)- sorter - header (60/70/120)- sorter - capper(50/100) |
Laminated Tube Line (project solution)
| line #1: Laminates Welder (auto unwebbing) - sorter - header (120)- sorter - capper(100) |
| line #2: Laminates Welder (manual unwebbing) - sorter - header (70)- sorter - capper(50) |
Q1:Why is the Fast PBL upgrade necessary?
New laminate developments require the Fast PBL upgrade to maintain quality. Running PBL like ABL causes issues, compromising tube quality and increasing rejection rates and costs.
Q2:Are you manufacturer?
Yes, We are the manufacturer and trading company.
Q3: What information should the customer provide to get an accurate quotation from us?
The customer should provide the related technical requirements, drawings, pictures, industrial voltage, planned output, etc
Q4: What is the payment term?
The payment term is 30% down payment, and 70% before shipment(T/T mode), we also accept other payment term, like L/C, DA, D/P etc
Q5. How long is your machine's warranty period?
All our machine have one year guarantee, starting from finished installation.
Q6. How could we do after one year warranty period?
We also can do service for you, but you need pay salary for my technician 80USD/day.
Q7. How could we do if the parts broken within warranty?
We would express the free replacement parts during the warranty date.
Q8. How do we solve the machine problem after your engineer leaving?
Generally speaking, there will be no problem after finish installing. In case you have any problem. You can contact our after sales specialist at any time.weour after-sales department with 30 engineers.Our engineers will take a solution video according your description.
>>
Safety blood collection multi-sample needle
>>
New Crop Good Delicious Potato (200g and up)
>>
Bicycle Indoor Gym Master Cycle Bike Exercise Trainer100kg Flywheel Spinning Bike for Gym Indoors
>>
Automatic wrist band deflashing machine Ultra Shot NS-120T
>>
6W Series Wall Mount Power Adaptor
>>
10.1 Inch FHD 1280*800 Desktop LCD Monitor PC Display
>>
CE certified high yield double roll fertilizer granulator
>>
New Season Basic Fluffy Designer Lady Slippers
>>
Home Security Smart Doorbell Muti-Apartment SIP2.0 Intercom System Security Video Interphone
>>
Series Automatic Hqt300L-1000 Bed Lathe CE Certified Slant Bed CNC Lathe Machine
>>
FRP GRP Material Septic Tank toilet septic tank sewage septic tank
>>
Fashionable 1080P Projector with WiFi 6 and Bluetooth Features
>>
Hot Sale Disposable Protective Face Mask Non-sterile
>>
HTCT High Quality Auto Cloth Cutter Fabric Textile Cutting Machine
>>
6L Oxygen Aluminum Portable Gas Cylinder Medical Cylinder
>>
Aluminium Sliding Door Pictures from aluminium double glazed windows & doors
>>
Ck6180 China Machine Flat Bed Heavy Duty CNC Manual Turning Metal Lathe Machine Torno Factory Price
>>
PERFECTRAIL Heavy Duty Spare Parts for DAF Trucks XF 105 106 45 55 65 75 85 95 CF LF SB PX4 PX5 PX7
>>
PCD Countersink Drill Bits Process Rivet Holes in Aircraft Skins Diamond Countersink PCD Diamond Cutting Tools
>>
Diamond and CBN Grinding Wheels for Camshafts, Crankshafts, Valves and Cylinder Heads