Basic Info.
Type
Tube Shoulder Injection
Plastic Type
Thermoplastic
Plasticizing Way
Plunger Type
Computerized
Computerized
Speed
55~70 Pieces Per Minute
Tube Diameter(mm)
60~220 mm
Extrusion Spraying Mode
Servo Motor Control
Change Time of Head Tooling
20 Minutes
Change Time for The Orifice Pin
5~10 Minutes
Change Time of PE Color
25~30 Minutes
Specification
2450*1800*2500mm
Production Capacity
100set/Year
Packaging & Delivery
Package Size
245.00cm * 180.00cm * 250.00cm
Package Gross Weight
2500.000kg
Product Description
Extruded Tube Line (project solution)
| line #1: extruder (1/2/5/6 layer) - sorter - header (60/70/120) - sorter - printer (3/5/6/8 color)- sorter - capper(50/100) |
| line #2: extruder (1/2/5/6 layer) - sorter - printer (3/5/6/8 color)- sorter - header (60/70/120)- sorter - capper(50/100) |
Laminated Tube Line (project solution)
| line #1: Laminates Welder (auto unwebbing) - sorter - header (120)- sorter - capper(100) |
| line #2: Laminates Welder (manual unwebbing) - sorter - header (70)- sorter - capper(50) |
Q1:Why is the Fast PBL upgrade necessary?
New laminate developments require the Fast PBL upgrade to maintain quality. Running PBL like ABL causes issues, compromising tube quality and increasing rejection rates and costs.
Q2:Are you manufacturer?
Yes, We are the manufacturer and trading company.
Q3: What information should the customer provide to get an accurate quotation from us?
The customer should provide the related technical requirements, drawings, pictures, industrial voltage, planned output, etc
Q4: What is the payment term?
The payment term is 30% down payment, and 70% before shipment(T/T mode), we also accept other payment term, like L/C, DA, D/P etc
Q5. How long is your machine's warranty period?
All our machine have one year guarantee, starting from finished installation.
Q6. How could we do after one year warranty period?
We also can do service for you, but you need pay salary for my technician 80USD/day.
Q7. How could we do if the parts broken within warranty?
We would express the free replacement parts during the warranty date.
Q8. How do we solve the machine problem after your engineer leaving?
Generally speaking, there will be no problem after finish installing. In case you have any problem. You can contact our after sales specialist at any time.weour after-sales department with 30 engineers.Our engineers will take a solution video according your description.
>>
UTR420-5 multi color rotary label letterpress paper straw flexo printer, pvc pet pe pp sticker flexographic printing machine
>>
Chalk Board Whiteboard Steel Sheet Raw Material
>>
CNC Router Woodworking Engraver with Atc Changing Bits
>>
Wholesale Price Two Flash Wheel Kids Kick Scooter
>>
Efficient Farm Machinery for Harvesting
>>
Powerful Hydraulic Concrete Pump Hbts60-13-118
>>
Double Stage Vacuum Transformer Oil Recycling Purification Unit Regeneration Plant
>>
Custom Folding Cardboard Box Packaging One-Piece Gift Box Packaging Perfume Cosmetics Jewelry Packaging Gift Box
>>
Portable concrete steel corrosion detector/ rebar corrosion testing meter
>>
150-1500kg/H Polymer PP Woven Jumbo Bag LDPE Plastic Film Pelletizing Recycling Granulating Machine
>>
Wood chipper machine wood shaving making machine animal bedding barn chipboard shaving board forage fodder
>>
High Automatic PVC Garden Irrigation Soft PVC Pipe Machines.
>>
Big Capacity Floating Fish Feed Sinking Fish Fodder Processing Machine
>>
Acrylic Stripe Wave Long Rainbow Board Stone Grain Plexiglass Thick and Thin Wide Strip Water Ripple Partition Cutting Processing
>>
Electrical Switch Making Injection Molding Machine
>>
Kaigui Supply Metal Ceiling Cross T Bar Roll Forming Machine
>>
High Quality Product Plastic Base Thin Frame UHD 8K 32 Inches Television Smart
>>
Truck Mounted Pump for Concrete
>>
High Quality Hydraulic Hand Press Metal Shearing Machine
>>
China Supplier Custom Made Home Residential Interior Room Sound Proof Steel Security Door Design for Sale