| MODEL | GF2-C100kw/125KVA |
| Powered by WEICHAI Engine | |
| Prime Power (50HZZ) | 100KW/125KVA |
| Standby Power (50HZ) | 112kw/140KVA |
| Power Factor | 0.8 Lagging |
| Phase Wires | 3-phases 4-Wires |
| Start Model | Electric |
| Protection | Low oil-pressure, High water temperature, Over-speed, Over-current |
| Engine Model | 6BTA5.9-G2 |
| Cylinders | 6 |
| Cylinder Arrangement | L |
| Bore x Stroke(mm) | 102X 120 |
| Compression Ratio | 17.5: 1 |
| Speed | 1500rpm |
| Cooling Method | Water - cooled |
| Starting Method | 24V DC electrical start |
| Full Load Diesel Consumption (L/H) | 25 |
| Engine Displacement (L) | 5.9 |
| Inspiration (L) | Natural |
| Lube Volume (L) | 14.3 |
| Coolant Volume (L) | 25 |
| Noise (Db) | ≤ 80 |
| Alternator Model | BRUSHLESS 274E |
| Alternator Power | 112KW/140KVA |
| Voltage | 230/400 V |
| Protection | IP23 |
| Voltage Regulation | ± 4% |
| Insulation Class | H |
| Voltage Control | AVR |
| Net Weigh (KGS) | 1400 |
| Dimensions (L x W x H) mm | 2900*1230*1700 |
| Optional | ATS (auto transfer switch) |
| BatteryCharger | |
| Base fuel tank (for open type) | |