Welcome to visit

Awwa C509 C515 Mj X Mj Mechanical Joint Gate Valve Resilient Seated Gate Valve

US$30.00-2,000.00 2 Pieces (MOQ)

Basic Info.

Type
Dual-through
Material
Cast Iron
Connection Form
Flange
Pressure
Medium and Low Pressure
Actuator
Manual
Seal Surface
Wedge Gate Valve
Thread Position of Valve Rod
Inside Gate Valve
Usage
Regulation, Safety, Flow Control
Standard
BS En 12266-1/Awwa C520
Application
Industrial Usage, Water Industrial Usage
Certificate
UL/FM
Colour
Ral 5005
Transport Package
Crate
Specification
DN50-DN600
Trademark
HGV
Origin
China
HS Code
848180
Production Capacity
200000 PCS Per Year

Product Description

Design Standard AWWA C515. Non-Rising stem, Resilient Seated Face to Face: ASME B16.10. MJ*MJ to AWWA C111/A21.11-12 (FL*MJ available upon request) Insoection & testing: AWWA C515 Fusion Bonded Epoxy Coated Interior and Exterior to AWWA C550 Standard Working Pressure:250PSI (200 and 300 PSI available on request) Working Temperature:-20ºC to 100ºC(-4°F to 212°F)Operator:Handwheel,2"Operating Nut,Gearbox
NO. Part Material(ASTM)
1 Body Ductile lron ASTM A536
2 Wedge Ductile lron EPDM/NBR Encapsulated
3 Wedge Nut Brass ASTM B124 C37700
4 Stem Stainless Steel AISI 420
5 Bonnet Ductile lron ASTM A536
6 Wedge Nut Gasket Rubber NBR
7 Washers Nylon/Brass ASTM B124 C37700
8 O-ring Rubber NBR
9 Gland Ductile lron ASTM A536
10 Operating Nut Ductile lron ASTM A536
11 Bonnet Gasket Rubber NBR
12 Bonnet/Gland Bolt CS With ZINC Plated/SS304
13 Dust Cap Rubber NBR
14 Top Bolts CS With ZINC Plated/SS304

Operation & Maintenance Manual
1. The Face to Face conforms to EN558 or ANSI B16.10, and the flange conforms to EN1092-2, B16.5 Please check the standards during installation.
2. It can be installed on horizontal or vertical pipelines.
3. The installation position should ensure to be used, maintenance and replaced easily.
4. Two-way use is allowed (the direction of the pipeline fluid can be ignored during installation).
5. Before installation, the valve should be stored in a dry place indoors and the wedge is in the open position.
6. The following work should be prepared before the valve is installed:
6.1 Carefully check the conditions of use before installation to confirm that it is consistent with the performance specifications of the valve.
6.2 Clean the inside of valve and sealing surface, and no any dirt on it.
6.3 Check the transmission device to see if it is firmly connected to the flange.
7. After the valve is installed, it should be inspected regularly. The main inspection items are as follows:
7.1 Check whether the valve body and bonnet are well sealed.
7.2 Check whether the seal between the bonnet and the compression cap is good.
7.3 Check whether the seal between the valve stem and the compression cap is good.
7.4 Check whether the seal between the valve body and the wedge is good.
7.5 Check whether the valve rotation is flexible.
7.6 After the valve is assembled, there must be no jamming when the switch rotates.
7.7 After the valve is assembled, the sealing and shell test should be carried out as required.
8. Possible faults,reasons and solutions:
Possible FaultsReasonsSolutions
Wedge sealing surface leaksThe rubber of wedge is damagedReplace the new wedge
The leak between stem and glandO-ring is damaged in the glandReplace the new O-ring
The leak between bonnet and glandThe O-ring outside the gland is damaged or the gland bolt is looseReplace the O-ring or tighten the gland bolt
The leak between bonnet and valve bodyO-ring is damaged in the bonnetReplace the new O-ring

Specific requirements for casting defect inspection
This specification clarifies the specific requirements for casting defect inspection and is applicable to the inspection of castings of this company and outsourced companies.
1. The casting surface must be clear and correct, and there must be no wrong characters, missing characters, or unclear characters.
2. There must be no single sand holes or pores on the casting surface that exceed 1MM, and shallow but piece-by-piece casting defects. Sand holes and pores on the casting surface that are less than 2MM can be repaired and smoothed with putty if they are not on the sealing surface and do not affect the wall thickness.
3. The flash, burrs, and box seams on the casting surface must be polished and smooth.
4. The casting must not have obvious defects such as deformation, shrinkage, lack of meat, box expansion, and box misalignment. For the gate frame, its thickness dimension must be inspected with the corresponding inspection fixture; for the large cover of the check valve, the plane with the O-ring groove must be inspected with a flatness inspection fixture.
5. The asymmetry between the inner cavity and the outer shape of the casting shall not exceed 1.5MM (including the center and flange).
6. The inner cavity of the casting shall not have defects such as bulging, lack of meat, excess meat, burrs, etc., and its shape and size shall be inspected with the corresponding gate.
The gate used (DN40-200) shall be replaced every six months, and DN250-600 shall be replaced once a year.
7. The surface roughness of the casting shall refer to the roughness sample: ≤N11~12, see Appendix 1.
8. The surface cleanliness shall be visually evaluated according to ISO8501-Sa2.5, see Appendix 2.
9. Each casting that passes the inspection shall be marked with its own inspection mark.
10. The castings inspected every day shall fill in the "Casting Inspection Record" truthfully.
11. Each furnace of the outsourced casting shall be accompanied by a test block, which shall be brought with the goods. If there is no test block, the goods shall not be accepted.
12. This specification is applicable to both our factory and outsourced manufacturers.
All casting outsourcing manufacturers are required to conduct 100% self-inspection according to the above inspection items, and then the factory inspection personnel will randomly inspect 20% of the castings sent in. If unqualified items are found, the specification will be fully inspected or rejected, and the relevant manufacturer will re-inspect and sort out the project, and after completion, it will be submitted to the inspection personnel for re-inspection.
>> EPE Flat Fender - 32*11 Inch
>> High Efficiency Energy Concentratored Solar Power Heater Collector Tube
>> Linear Trunking Light 24W 40W 50W 60W LED Tube Track Line Lights
>> LED Lights 3 Wheel Folding Adjustable Kids Scooter
>> Coupon High Quality Logo Women Men Smart Watch Printed Luxury Customized Paper Watch gift Packaging Boxes
>> Digital rgb Waterproof colorful car led strip Exterior ambient Lighting for Remote Control Car Underglow Lights
>> LIANSU CE Industrial Hot Air Plastic Granules Dryer Hopper Dryer Plastic Drying Machine
>> Queen Size, 1000 Grams Filled Hotel Quality Bedding Bed Pillows
>> K20A3 K20A1 Engine Timing Chain for Honda Accord 2.0 TC6002
>> Hot Selling Skmei 1900 Luxury Rose Gold Led Wrist Watch for Men Stainless Steel Mesh Strap Wholesale Price
>> Small Business Ideas 2024 Toilet Paper Roll Band Saw Cutting Machine
>> XCMG Official mm10-15 Automatic Interlock Concrete Cement Brick Making Machine Equipment
>> 200ton/4000 E300p CNC 4 Axis Press Brake 100t3200 CNC Sheet Metal Bending Machine
>> Timing Chain Kit TK9360 with oe no.13091W0400 1302103G00 1302485G00 1308510W10 for NISSAN NA16 1.6L
>> very hot fine machine to make stick coal briquettes for coking price
>> High-Performance 14cbm Sany Benz Euro4 8X4 Concrete Mixer Truck
>> Best Price 5kw Complete Solar Kit Home Solar Power System off Grid on Grid 10kw Solar Panel for Home
>> Efficient CNC Endless Diamond Wire Saw Cutting Machine for Precision Crystal Cutting
>> Taijia NDT Rebar Scanner Integrated Rebar Locator Concrete Rebar Detector JY8ST
>> Home Texitle 100% Polyester Plain Dyed Velvet Upholstery Furniture Sofa Fabric