US$500.00-30,000.00 | 1 Set (MOQ) |
Mould material | 100~300k, Mould Material(Soft Mould):P20,718,2738...... 300~500k, Mould Material(Hard Mould):H13,S136,2344...... 500~1000k, Mould Material(Hard Mould):2343EFS,2344ESR, 2367ESR,SKD61...... |
Specific feed/gate locations | |
Surface finish | Commercial polishing (General Polishing) Highly polish (Mirror Polish) Matte Finish (EDM Treatment) |
3D/2D drawings | STP/ STEP, IGS/ IGES, x_t, CAD |
Fast mould design | We can be within 1-3 working days after getting customer's drawings. |
Lead time | 35 - 45 days after getting the mould design confirmation. |
Mould testing | All of the moulds can be well tested before the shipments. Videos testing the moulds are available. |
Minimum order | Small orders can be accepted. |
Production capacity | 45-50 sets/month. |
Port | Shanghai |
Runner | YUDO runner, hot Runner, cold runner ... ... |
Payment terms | L/C T/T Western Union MoneyGram. |
Mould making service | OEM/ODM service is available. |
After-sales service | Life-long gurantee, Comes with free mold parts. |
Safe packing | In strong wooden pallets to avoid any damages during long transportation. |