US$50,000.00-100,000.00 | 1 Set (MOQ) |
roduct Name | Experienced Quality Injection Rattan Plastic Storage drawer Mold |
Product material | pp |
Core&Cavity Steel | 2316,2738,H13,S136 ECT |
Steel hardness | HRC35-38 |
Mould Standard | DME |
Cavity Number | 1 |
Injection System | side gate |
Ejector System | ejector pin |
Cycle Time | 30 s |
Tooling lead time | 60 days |
Mould life | 2,000,000 |
Quality assurance | ISO9001 |
Our Advantage | 1.High quality |
2.Reasonable price | |
3.On time delivery | |
4.Good After-sale service | |
5.Strict quality control | |
6.All the mould are automotic. | |
Offer you | In-time response on letters, telephone calls or fax |
In-time supply the quotation and mould designs | |
In-time communication on the technical points | |
In-time sending pictures for the mould machining progress and mould finishing schedule | |
In-time mould test and sample delivery | |
In-time mould delivery. | |
For more information please contact us. |
| |||||||||||||||||||
1. Samples/Drawing & Requirement from you | |||||||||||||||||||
2. Mould design: we will Communicate& Exchange the opinion with you after you place order. | |||||||||||||||||||
3. Material Purchase: Steel cutting and Mould base tooling. | |||||||||||||||||||
4. Assembling. | |||||||||||||||||||
5. Inspection of mould: following and controlling the tooling processing. | |||||||||||||||||||
6. Mould testing: We will inform you the date. Than will send the sample' s inspection report& injection parameters with the sample to you! | |||||||||||||||||||
7. Your instruction & confirmation for shipment. | |||||||||||||||||||
8. Ready made mould before packing. |