US$38,888.00-49,999.00
|
1 Set
(MOQ)
|
Basic Info.
Automatic Grade
Automatic
Factory
Accept Custom-Made - 17t
After-Sales Service Provided4
Engineers Available to Service Machinery Overseas
After-Sales Service Provided2
Video Technical Support
Key Selling Points
Easy to Operate
Front Top Specification
2/3/4rt
After-Sales Service 1
on-Line Support
Transport Package
Simple Packing or as Customer Request
Specification
3.05*4.25*2.6
Production Capacity
300 Set /Per Year
Product Description
Product Description The special design of the oil system,good stability,stable conversion,low failure rate,reliable,and guaranteed quality.
The high-precision steel structure of the acess template is ground and nitrided to achieve a high-precision platform surface.
Accurate and safe positioning of the mold in and out,ensure that the mold is not damaged.
It is suitable for various two-layer or multi-layer molds,and has rapid production capacity.
Suitable Products: Industrial Rubber/Medical/Lifestyle/Auto parts /Sealings.
Detailed Photos
Product Parameters
Type | ZJP-600T |
Maximum hot plate spacing | 500 (adjustable) |
Mold moving stroke (mm) | 1300 |
Clamping force (Ton) | 600 |
Heating plate dimension (mm) | 1200*1200 |
Opening stroke (mm) | 400 |
Minimum mold thickness (mm) | 0-100 |
Total power (kw) | 69 |
Machine size (m) | 3.05*4.25*2.6 |
Whole weight (Ton) | 17 |
Certifications
Company Profile
Our Advantages We are own factory,so we make all the machine parts by ourselves, Besides, you can get the customize service with your requirements,At present, we have established strong business relations with domestic and international customers. Persisting in the aim of "striving for existence by quality and striving for development by sincerity ", we sincerely hope to enter into friendly cooperation with customers on the basis of superior quality, competitive prices and excellent after-sales service, striving for joint resplendence.
After Sales Service 1-Quality guarantee period:Within 12 months,During this period,if there are troubles with machines,the manufacturer should send engineers to repair or replace the spare part if needed.
2-According to demand of buyer,the supplier send engineers to guide the install and the debug.But the buyer should undertake all cost,such as ticket,food,hotel for supplier,also they need pay 200 USD for engineer one day.
3-For the damage caused by the buyer,supplier provides the spare part and repair it with the best price.
4-If machine is broken up due to the not correct of the buyer within the one year period,supplier can send engineers if need to assist buyer,but buyer should undertake all the cost.
5-Within one year guarantee period,if machine broken down due to its quality itself,supplier should solve this for buyer with its cost.
6-Two parties can discuss other items which are not mentioned in this place.
FAQ Q1: Where is your factory located?
A1: Hunan Zhongjun Technology Co.,LTD is located at Jinlong High-tech industrial zone ,Yueyang City ,Hunan Province, China
Q2: Are you an integrated supplier for rubber machine ?
A2: Yes, we can provide the complete solution line to customer according to customer's requirement.
Q3: How about the quality control in your factory?
A3: Zhongjun has the SOP (Standard Operation Procedure) and all the production step must follow up this SOP. Every machine needs at least automatic running over 48 hours and must be inspected carefully before shipment.
Q4: Will you offer the pre-sales service?
A4: Yes, we have an experienced pre-sales team to support customers not only including machine, technology also water .electrical, machine layout in factory, etc.
Q5: What about the after-service? Will you send your engineer to my country to help commission and install the machine?
A5: Surely, we have many experience technical engineers for oversea service, they would help you install machine and support training to workers also.
Q6: What is the delivery time of the machine?
A6: Actually, the delivery time of the machines is depended on the machine options. Normally, the delivery time of standard machine could be within 20-50 days.
Q7 : What is the warranty of the machine ?
A7: The whole machine's warranty period is 12 months and key parts will be depended.
Q8 : Do you provide any spare parts with machine?
A8: Yes, Zhongjun will provide one set standard spare parts to customer according to different machines.
>>
Cbr Cross Head Double Speed Position Limit Switch for Crane Travelling European Type Hoist Stop
>>
High Quality Modern Design Stone Coating Metal Roof Tiles Anti-Corrosion and Rust-Proof for Apartments
>>
F2.8 25mm 1.2" 25MP C-Mount Fixed Focus Industrial Machine Vision Lens
>>
Rsd90 EPE PE Foam Sheet Making Machine
>>
Hard Texture Wood Core Raised Access Floor Panels for Banks, Telecommunication Centers, Smart Offices, Computer Rooms, Areas of High Humidity
>>
Hydraulic Digger Machine 6.08 Ton Brand New Crawler Excavator with Good Service
>>
Stone Cutting Machine Sign-1318 CNC Router with 5.5kw Water Cooling Spindle
>>
Sephcare high quality iron oxide/ultramarine blue pink violet/chrome oxide green colorant pigment
>>
Aluminum Alloy Portable Easy Folding Liqhtweight Electric Wheelchair for Disabilities
>>
SUS316 Industrial Everse Osmosis RO System Pure Water Treatment, Anti-Penetration Equipment
>>
1500W 2000W 3000W 4000W 6000W Robot Fiber Laser Welding Machine with Seam Tracking System
>>
Good Quality Widely Selling Leather Hem Binding Straight Thumb Red Color Genuine Leather Gloves Supplier
>>
High Quality Soya Bean Paste
>>
Sqmg New Design Self Loading 2.6 Cubic Meters Concrete Mixer with Loader 3.5cbm Drum
>>
8cbm Mixer Drum Concrete Mixer Tank Cement Mixers Bucket Export to Philippines
>>
Custom 6D*3.6D 26mm HDG/G43 Long Length Dock Fender Chain
>>
Factory Direct Sale 304/316 Stainless Steel Coupling of Pipe Fitting
>>
High quality light weight iic hearing aid in ear
>>
395 Clutch Cover/Clutch Press Disc 183482001680 for Chinese Bus and Truck
>>
Boat Fiberglass Boat Fishing Boat Mr-30