Welcome to visit

High-Density Plastic Encapsulated Integrated Circuit Lead Frame Tining Equipment Series

US$200,000.00-5,000,000.00 1 Set (MOQ)

Basic Info.

Warranty
1 Year
Certification
ISO
Application of Equipment
for Tinning After Plastic Sealing
The Way of Unlaod and Offload
Strip to Strip, by The Steel Belt Toclamp
Speed
3-12m/Min
Specifications
1-2 Channels
Material of Tank
PP/PVC/CPVC/Stainless Steel
Spray Material
Electronic
Shipping Method
Sea Shipment
Transport Package
Suitable for Sea Shipment Packing
Specification
Customized
Trademark
Allmerit
Origin
Dongguan, Guangdong
Production Capacity
100 Sets/Year

Product Description

Product Description
High-density plastic encapsulated integrated circuit lead frame tining equipment series
Speed: 3-12m/min
Specifications: 1-2 channels
Cladding: CPK≥1.67
The way of unlaod and offload: Strip to Strip By the steel belt toclamp
Applicable product width: 20-110mm; thickness: 1-12mm
Our equipment can achieve the integrated automatic production of electrolytic softening, high-pressure water jet, high-speed tin plating and blanking, through the feeding system,plastic-packaged ic lead frame is continuously clamped and fixed on the continuously running transmission steel belt.

Detail Photos
Finished Product Display

Component
Certifications

Our Customers
Company Profile
FAQ
FAQ
Q:Are you manufacturer or trading company ?
A:We are a professional manufacturer of large-scale research and production of semiconductor wet process equipment. We have a professional research and development team and production and assembly workshop, which can ensure quality and after-sales service.
Q:What is the width of the equipment ?
A:The width of the equipment is about two meters.
Q:How long is the warranty ?
A:The warranty period of our equipment is one year. One-step service, professional engineers to follow up to solve the problem.
Q:What is the packaging of the equipment like? What is the delivery method?
A:Standard export fumigation sign wooden box packing or delivery by land or sea.
Q:how to install and debug the equipment after its arrival ?
A:After the equipment is issued, we will arrange a senior installation and debugging team to the your company to complete the installation,debugging,training,etc.,and assist your company in the early mass production.
>> Infrared Camera Module IP Thermal Imaging Camera for Drones Uav Fpv
>> Factory Direct Wholesale 580g Infusionmax Cream Charger Empty Cylinder Plates for Cream Whipped Chargers
>> Sightseeing Panoramic Elevator Lift Cabin
>> Micro-ATX Motherboard Intel I3 I5 I7 13 14 Gen Mainboard B760 3 LAN Pciex16, Pciex4 Board
>> G6 2.4G USB Optico Gaming Mice Ultra Light Gaming Mouse
>> 17 Inch Industrial PC Embedded Touch Screen Monitor Panel PC
>> HDMI Keystone Cable with Screw Mount HDMI Keystone Jack Coupler
>> SFI 3.3 Racing Shoes Red Color Flame Resistant Material Customized High-Cut Racing Boots Racers Safety Gear
>> Strong Farm Fencing For Animal Poultry with Expanded Metal Mesh
>> 8KW Rotary Table High Frequency PVC Plastic Welding Machine
>> Indoor Outdoor High Quality Long Linear LED Wall Light with 100V-227V 220V Dimmable Daylight Luminaire Lamps
>> Grain Product Making Machines Patented Food Production Line/Other Food Processing Machinery
>> Hot selling wholesale cheap custom accoson sphygmomanometer
>> 3 Axles 45000 Litres LPG Gas Storage Transportation Tank Trailer Tanker
>> HT-225 Concrete Test Hammer with High Aluminum Shell Design
>> Factory Price Canned Corned Pork Beef Chicken Luncheon Meat Canned Food
>> Brass Stainless Steel Timer Controlled Electronic Condensate Bsp Solenoid Electronic Air Compressor High Temperature Pressure FKM Viton IP65 Thread Drain Valve
>> OEM Catering Plastic Microwave Food Safe Compartment Meal Prep Take Away Disposable Food Container for Supermarket Restaurant
>> 2020 OEM Wholesale High Quality Christmas Hanging Ornaments
>> Customized CNC Machined / Turning / Grinding / Milling / CNC Lathe Metal Stainless Steel Aluminum Precision Machining Parts