Welcome to visit

Innovative Aluminum Formwork System for Efficient Modern Construction Projects

US$75.00-110.00 1 Square Meter (MOQ)

Basic Info.

Model NO.
Aluminum Formwork
Type
Industrial Aluminium Profile
Shape
Flat
Grade
6061-T6
Temper
T3-T8
Window & Door Aluminium Profile
Industrial Aluminum Profile
Alloy
Alloy
Surface Finishing
Powder Spraying
Alloying Ingredient
6061
Certification
ISO
Polished Aluminum Profile
Mechanical Polishing
Aluminium Grade
6061-T6
Tonnage/Contaioner
25 Ton
Package
Not Packed or Fumigated Wood Packaging
HS
8480600090
Density
2.72
Currency
USD
Transport Package
Container
Specification
Contact us for specific details
Trademark
Yingmo
Origin
Shangqiu Minquan
HS Code
8480600090
Production Capacity
10W-20W Square Meters / Mouth

Product Description

Aluminum Formwork Assembly: A Comprehensive Guide to Modern Construction Solutions
In the ever-evolving landscape of contemporary construction, aluminum formwork assembly stands as a revolutionary core, reshaping the way structures are realized. Through the utilization of precision-engineered prefabricated aluminum panels and components, this innovative system creates impeccable molds for concrete pouring, delivering unparalleled efficiency and consistency. By transcending traditional construction techniques, it offers superior speed, quality, and sustainability. Embark on the detailed exploration below:
Panel Placement: Precision and Ease Combined:
Step 1 Step 1 involves the meticulous arrangement of lightweight, innovative aluminum formwork panels into the designated layout, meticulously adhering to the architectural blueprint of your project.These pre-engineered panels interlock with precision, ensuring dimensional accuracy while faithfully maintaining the architectural vision of the structure after concrete setting.Thanks to their ultra-light composition, these aluminum panels are easily maneuverable, significantly reducing worker fatigue and accelerating the entire assembly process.Securing Panels: Ensuring Stability and Integrity:
In Step 2, panels are firmly anchored using a variety of connectors such as clips, bolts, and wedges, each playing a crucial role in preserving the assembly's structural integrity.These robust securing components hold the panels together steadfastly, forming a stable mold that eliminates potential gaps or misalignments.Ingeniously designed corner and edge connectors reinforce the formwork's strength, ensuring a snug seal during concrete pouring and effectively preventing leaks.
CUSTOMER: Incoterm: FOB QingDao
Date: Dec 24th
Part No.Part DescriptionUnit price (USD/kg)Processing charges USD/kgTransport from Minquan to Qingdao Port USD/kg
1C100-C500 Panel <A00(Changjiang Ingot price)(Today USD2.725)/1.13USD 0.49/kgUSD 0.08/Kg
2C600 Panel USD 0.61/kg
3C100-C400 <(aluminum formwork (extrusion))A00(Changjiang Ingot price)(Today USD2.725)/1.13USD 0.34/kgUSD 0.053/kg
4C400-450-500(aluminum formwork(extrusion))USD 0.40/kg
5C600(aluminum formwork(extrusion))USD 0.50/kg
Adjustment and Alignment: Achieving Perfect Symmetry:
Once panels are positioned, Step 3 requires meticulous adjustment to secure perfect alignment and leveling, a critical undertaking for ensuring the structural integrity of the construction.Perfect alignment is vital, safeguarding the concrete's structural integrity and precise geometry, ensuring dimensions and stability remain impeccable.Reinforcement Installation: Building Strength from Within:
Step 4 entails the strategic placement of essential steel reinforcement bars (rebar) within the formwork, following the structural design meticulously.Rebar is essential, providing tensile strength to the concrete, minimizing cracking, and ensuring long-lasting structural resilience once the concrete cures.Each bar is meticulously positioned, ensuring optimal integration into the concrete during the subsequent pouring process.Concrete Pouring: The Final Pour to Perfection:
With all preparations complete, Step 5 ushers in the transformative process of pouring concrete into the mold, a decisive phase in the construction journey.The reliable aluminum panels preserve the concrete's precise shape, ensuring a flawless surface finish upon removal.Utilizing aluminum formwork significantly enhances the finish quality, reducing the need for additional finishing work post-hardening.
Dismantling and Reuse: Embracing Sustainability:
Post-curing, the process concludes with Step 6 , which involves the careful dismantling of the formwork, highlighting sustainability and cost-efficiency.The durability and corrosion resistance of aluminum enable these panels to be reused multiple times, underscoring the formwork's eco-friendly and cost-effective advantages.Our panels undergo an exceptionally rigorous cleansing and inspection process, ensuring they are immaculately prepared and immediately ready for reuse. This meticulous protocol not only drastically minimizes waste but also maximizes resource efficiency. By doing so, Henan Yingmo Aluminum Co., Ltd. is setting a groundbreaking precedent for sustainable construction practices, showcasing our unwavering commitment to environmental responsibility.Advantages of Aluminum Formwork Assembly: Pioneering the Construction Industry with Cutting-Edge InnovationAccelerated Construction Timelines: Propel Your Projects Towards Completion at Unprecedented Speeds: Our ultra-lightweight panels are ingeniously crafted for effortless maneuverability and rapid assembly, significantly slashing construction timelines and propelling projects towards quick and seamless completion.Superior Quality Finish: Diligently Crafted to Perfection for Unmatched Aesthetic Brilliance: Experience the extraordinary advantages of our aluminum formwork, precisely engineered to deliver smooth and exceptionally accurate concrete surfaces. This revolutionary technology virtually eliminates the need for extensive post-pour finishing, ensuring a flawless finish with each application, and redefining quality benchmarks in the construction industry.Exceptional Reusability: A Tribute to Longevity and Cost-Efficiency: Our aluminum formwork is distinguished by its extraordinary durability and exceptional reusability, expertly designed to endure countless concrete pours. This remarkable attribute not only results in significant material cost savings but also dramatically cuts down on construction waste, offering immense economic and environmental advantages.Ultimate Cost-Effectiveness: Investing in the Future of Construction: Step into the future of construction with our aluminum formwork. While the initial investment may surpass traditional options, the profound long-term financial benefits are undeniable. Enjoy substantial savings through its remarkable reusability and reduced labor costs, establishing this formwork as the pinnacle of cost-effectiveness and financial acumen.Enhanced Safety Standards: Elevating Worker Health and Safety with Innovative Design: With a strong commitment to the health and safety of construction teams, our lightweight aluminum formwork system showcases superior safety features. Its ease of handling greatly reduces physical strain, thereby enhancing safety standards on construction sites and promoting a healthier, more productive work environment.Conclusion: Defining the New Standard in Modern Construction:Our aluminum formwork assembly establishes a new benchmark for efficiency and effectiveness, offering a streamlined process that outperforms traditional systems. It ensures rapid assembly, immaculate finishes, and exceptional reusability, accelerating construction timelines and significantly reducing project costs. This makes it the quintessential choice for tackling the complex challenges of modern construction projects, leading the way for the future of building innovation.
FAQ
Q: Are you trading company or manufacturer ?A: We are factory.
Q: How long is your delivery time?A: Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock.It is according to quantity.
Q: Do you provide samples ? Is it free or extra ?A: Yes, we could offer the sample for free charge.
Q: What is your terms of payment ?A:Payment terms:30% down payment, 70% on Copy of B/L.
Other Payment terms(LC) : letter of credit 60 days leave Qingdao port and 10% deposit.
If any question, please feel free to contact us !

>> LINGKE High precision plastic welder machine 20kHz 2000W plastic ultrasonic welder
>> Manual Conventional Milling Equipment Knee Type Milling Machine for Metalworking
>> Leopard Underarm Bag Custom Leather Handbags for Women Stylish Ladies Shoulder Bag
>> Yaomatec 25.4mm Handheld Online Inkjet Printer Colorful Ink Cartridge
>> Anti-Slip Park Sidewalk Square Tile Machinery Cement Color Pavement Tile Machine Airport Hall Floor Tile Production Machine
>> China Yds 15 Liquid Nitrogen Tank Animal Frozen Semen Storage
>> Docod G100e 12.7mm Handheld Mini Portable Inkjet Printer Gun Tij Batch Coding Expiry Date Barcode Printing Machine for Paper Bag
>> WDHC1600 Automatic PP Spunbond Meltblown Nonwoven Fabric Cloth Reel Slitting Cutting and Rewinding Machine
>> Welding Fiber Laser 2 Kw Welding Machine for Steel Welding
>> Portable Energy Storage Outdoor Camping 2000W Home Power Backup Portable Power Station
>> Customized Capacity HDPE/PP/PE Plastic Waste Bottles Crushing Washing Recycling Equipment
>> High Rigid X6325 Medium Duty Milling Machine 3 Axis Metal Universal Turret Milling Machine Swivel Head Milling Machine X6325 Vertical Milling Machine
>> New Industry Leading Durable Backpack Spine Protection School Bag for Children
>> Wholesale Classical Equestrian/Horse Saddle
>> CNC Lathe Large Aperture Heavy Cutting Ck6180 × 1000 Integral Floor Standing Machine Tool
>> Environmental Protection B1 Fire Retardant 3D Embossed Texture Vinyl Wall Coverings for Hotel Wall Decoration
>> Low Price Small Shredder Steel Drum Metal Barrel Shredder Big Paper Shredder Machine Blade Shredder Blue HDPE Drum
>> GPRS WiFi NFC Biometric Fingerprint Time Attendance with Android System
>> Girls Mesh Multilayer Pompadour Party Wedding Dress
>> 05-20529-000 05-23045-000 05-23045-001 S-20397 Expansion Tank Coolant Reservoir water tank used for F reightliner