Installation Method | Screw bolts or highly adhesive double-sided tap fixed. With 1:1 rate of fixing template for installation reference.
|
Package | Covered with bubble wrap inside, and packed with wooden case outside, inside with foam board,
|
Also can be packed per your requirements. |
Lead Time | Production will be arranged within 8 hours after down payment received. |
The delivery date will be decided based on the size, complexity and quantity. |
But, we will delivery the products on time according to the contract on any account. |
Payment Method | T/T or West Union. |
Shipping Method | Door to door shipping service is available (DHL, UPS, TNT). |
A: Yes.
A: About 80 workers.
A: billboard, light box, signage, channel letters, and so on.